Extreme Engineering
In Celista, we’re finally out of the ground with the foundation for our second post-wildfire rebuild. The new home is being built on virtually the same footprint as the old home, which was destroyed in last summer’s catastrophic blaze. But progress has slow and deliberate, requiring ingenuity and a considerable amount of engineering.
The lot is quite steep, with both existing retaining structures in place at the front and the back. When we started construction, it became quickly apparent that we couldn’t disturb either of these structures. In particular, we couldn’t risk the possibility of collapsing the neighbouring house’s driveway, which had been built using a sizeable rock retaining wall.
Following the guidance of our engineers and with oversight by the CSRD, we made a decision to leave the back wall of the old foundation permanently in place to support the rock retaining wall above it. We then created the back wall of the new foundation just inside of the old one, using ICF (insulated concrete forms). The new wall was, in turn, supported in place with steel beams until the concrete cured. Only at that point were we able to pour the rest of the ICF foundation, which took place earlier this week (see the photos above).
After a great deal of careful planning and execution, we’re pleased to say that we’re now able to proceed with framing of the new home.
We suspect that many of the scheduled rebuilds of fire-gutted homes on the North Shuswap will require this type of consideration and treatment. Needless to say, we’re up to the task!