In Anglemont, we’re now into the final stages of finishing at a spacious lakeview home that we’ve dubbed “the castle” because of it’s 4,000 square foot size and the huge amount of concrete that was required to pour the foundation and retain the steep slope of the building lot.

This past week, our cabinet provider on this job, 7 Point Millworks & Installations Ltd. out of Kamloops, make excellent progress on the natural wood cabinetry that is featured throughout the home. As well, the solid surfaces were installed by Colonial Countertops, also from Kamloops. The photos above give you a few views on the work in progress.

Flooring is also wrapping up. The majority of the flooring is tile, being installed by Bridgeport Floors. In the week ahead, our tile installers will continue work in the custom showers. 

We started this home last summer, and we’re on schedule to wrap the entire project up by the end of March. The final month of this job with see us finishing the exterior masonry and railings outside, and inside, we’ll be carrying on with plumbing and electrical finishing once the tile floors are complete.