Your caption goes here!
    • Eagle Bay Waterfront Retaining

      September 02, 2017
      Retaining wall forming is well underway on this Eagle Bay waterfront residence after receiving approvals from the CSRD and Ministry of Environment for work within the Riparian zone. Existing failed retaining walls were removed, along with outdated septic tanks and failing concrete deck stairs.

      Septic treatment plant installation with field time dosing system is underway and relocated further from its original near lake location. Sub-surface rock is posing challenges for the install crews and hydrology engineers are on site reviewing options.

      Steel beams have finished production and awaiting pickup for future install to replace lower lakeside aged decking. Structural engineering and steel beam construction allow for improved deck space with cantilever over lakeside retaining walls.

      Future work includes replacement of upper lakeside decking and rails, new roofing, fascia, soffits and gutters plus asphalt drive, concrete walks and entry stairs.