    • Blind Bay Renovation

      April 21, 2017
      Everyone, including the home owners, are working overtime on this renovation in an effort to meet a May long weekend time occupancy.

      Furnace has been replaced and cold air returns have been added to improve indoor air circulation.

      Windows and exterior doors are installed and spray foam insulated.

      Issue prone Poly B waterlines have been removed and replaced with updated Pex piping throughout.

      Interior textured ceilings have been scraped on both floors and floated in preparation for future painted ceilings. Numerous drywall repairs and touch-ups have also been completed.

      Interior doors, hardware, finishing trims and stair hand-railing and spindles are on site and installing.

      Cabinets and flooring are scheduled for installation early next week just after ceiling, kitchen and bathroom wall painting.

      Siding replacement is underway on the house and new siding is also being installed on the new backyard shop now that its roof shingles are complete.

      A backyard pool has been installed and waiting for 50% road bans to lift for concrete placing and finishing.

      Nothing like a full house full of trades!